Design of industrial plants, logistics hubs and headquarters in Veneto
Plants, logistics hubs, headquarters and wineries:workplaces that work from day one,grow with the company and represent it. Plants, logistics hubs, headquarters and wineries:workplaces that work from day one,grow with the company and represent it.
For a company, the building is a work tool: it must work from day one, grow with the business and represent the brand. We start from the process, the flows and the people, and steer the approvals up to final inspection, without stopping production.
What we design
Plants and production campuses
New sites and extensions, up to campuses of over 60,000 m² of roofed area such as Unox in Cadoneghe.
Logistics hubs
Warehouses, yards and loading bays organised around the flow of goods and vehicles.
Headquarters
Offices and reception spaces integrated with production, such as Orasesta in Padua and Enerblue in Candiana.
Food production and wineries
Food plants and wineries, where process and hospitality coexist.
How we work with the company
The brief with each department
Production, logistics, offices and safety contribute to the brief before the concept.
Approvals strategy
SUAP, zoning variants, fire safety and stormwater compliance set up together with the design.
Business continuity
Phased construction, so that the business does not stop during the works.
Room to grow
Structural grid, building services and land ready for the extensions of the coming years.
A shared BIM model
Architecture, structure and building services in a single model: clashes resolved before construction and verifiable quantities.
Documentation for facility management
As-built drawings and documentation for those who will run the building.
Frequently asked questions
Where does the design of a new production site start?
From the process: flows of materials, people and vehicles, organisation of departments, expected growth. The resulting brief becomes the basis for the layout and the choice of structural system.
How can a plant be extended without stopping production?
With phased construction agreed with the company: separate routes, noisy works during shutdowns, planned connections to building services.
How can an industrial building represent the company?
Through a few consistent choices: the street front, the entrance, the spaces for customers and visitors, the quality of the workplace. We did so, for example, for the Unox headquarters and for Enerblue.
How is the process set up when a zoning variant is needed?
With a strategy defined before the design: preliminary meetings with municipality and province, SUAP procedure, environmental assessments and authority opinions coordinated in a single schedule.
How is a building prepared for the growth of the coming years?
By leaving room on the plot, an extendable structural grid and building services sized for extensions, so that later phases need no demolition.
When do environmental certifications (LEED, BREEAM) make sense?
When they answer an ESG strategy or a request from investors and customers. We assess them at the start, because they affect design and costs.
What do you hand over for running the building?
As-built drawings, certificates and building services documentation, useful for maintenance and future extensions.
Projects
The studio in figures
- 30 industrial and logistics commissions and 5 office commissions since 2014
- From a few hundred to over 60,000 m² of roofed area (Unox campus in Cadoneghe); logistics hubs of over 8,000 m²
- Clients include Unox, Enerblue, Orasesta, Padovana Macinazione, Lubing, Sekure, Induchim, Guidolin Eurotruck, Campagnolo Trasporti, Jolly Caravan, Nova Funghi, Barollo winery








